Ipswich Performing Arts Centre

Project Snapshot

Category

Install, Refurbishment, Commercial

Date

2018

Location

Ipswich

Project Value

$430,000

Project Description

CBM Services Group was engaged by Intrec Management to complete the Mechanical services installation to the new Performing Art Centre and H Block refurbishment designed by Multitech Solutions.

Works included:

  • Multiple VRV Systems comprising of split ducted, wall mounts and under ceiling Cassettes
  • High-level duct work exposed duct work in the auditorium
  • New MSSB’s and Mechanical electrical installation
  • Demolition of existing A/C in H Block to make room for new Installation
  • Install 14x ceiling cassettes and fresh air Fans to H block complete with MSSB and Mechanical electrical
  • DET Standard controls throughout both buildings